Detachable Container Houses

A frame and panel approach to site offices and accommodation.

Begin with the unit layout and component schedule. Confirm assembly responsibilities, services and the project conditions before selecting a configuration.

Frame and panel building sample in the showroom. Confirm the exact product and component schedule with the team.

Review the unit as a set of components.

Use the visible sample to discuss the building envelope. Connection design and assembly details must come from the selected model documentation.

Side wall, perimeter frame and doorway of the showroom sample.
Component review checklist
Component group Information to review
Main frame Members, connection details, material schedule and model identification.
Wall and roof enclosure Panel types, thicknesses, finishes, openings and sealing details.
Floor assembly Floor structure, surface finish and any wet area requirements.
Doors and windows Location, opening dimensions, frame and glazing specifications.
Connections and accessories Fastener schedule, trims, seals and the supplied accessory quantities.

Organize the space before counting units.

Share a functional brief, then review the layout and any proposed connection between units. A project arrangement needs its own drawings.

Workforce accommodation

Define the occupancy brief, room allocation, storage and sanitary facilities. Confirm which functions are inside each unit and which are shared.

Explore accommodation applications ↗

Multiunit requirements

Provide a site sketch and intended arrangement. Connections, circulation, foundations and any multilevel proposal require a reviewed project specification.

A single showroom unit. Its photo does not define an approved project layout or stacking arrangement.

Give service interfaces their own review.

Room placement and services should be agreed together so local connection work is planned before delivery.

Water and drainage

The photographed sample has clearly marked service connection positions. Your model may use a different arrangement, so ask for the corresponding interface drawing.

Electrical and internal fit out

Confirm circuits, sockets, lighting, partitions and any sanitary package in the component list. Destination requirements must be reviewed for the actual fittings.

Materials and evidence

Request the panel and component specification with any relevant documentation. A report for a material or fitting does not approve a complete project.

Review technical document scope ↗
Connection detail from the same frame and panel showroom sample. Interface locations vary by configuration.

Agree on assembly scope before shipment.

The order needs a coordinated component list and a practical plan for the destination site.

  1. Check the package schedule

    Match frames, panels, doors, windows, accessories and separately packed equipment to the packing list.

  2. Review the assembly information

    Obtain the model specific installation sequence and connection information. Confirm personnel, tools and lifting arrangements with the project team.

  3. Coordinate site connections

    Prepare foundations, utilities and access against the approved site arrangement and supplied interfaces.

  4. Agree on acceptance checks

    Define the checks and records required for the delivered components and completed assembly.

Confirm the factory supply

  • Component identification and quantities
  • Included finishes, fixtures and accessories
  • Packing method and package dimensions
  • Inspection records and agreed documents

Confirm destination work

  • Site access and unloading arrangement
  • Foundation and local design requirements
  • Assembly team, tools and equipment
  • Utility connections and local inspections

Request a usable procurement package.

The following records should correspond to the selected unit and project. Ask for them before finalizing your bill of quantities.

Unit and component records

Model reference, dimensional drawing, room layout, component schedule and configuration list.

Request product records

Questions about detachable buildings.

Keep the specification tied to the actual unit, connection method and site brief.

Can units be combined or stacked?

Any proposed combination or multilevel arrangement needs model specific engineering and project review. Do not infer permitted configurations from a showroom photograph.

Can a unit be moved and reassembled?

Discuss the intended relocation cycle with the team. Suitability depends on the actual connections, component condition and approved dismantling and assembly method.

Does assembly need tools or lifting equipment?

Confirm the personnel, tools, lifting and other equipment required by the selected model and site conditions. No universal tool free or equipment free assembly promise applies.

Is this the same as Flat Pack?

These terms can refer to different product and packing arrangements. Ask for the exact model, component schedule and delivered condition so the quotation identifies what is being supplied.

What is included in a standard unit?

The agreed configuration list controls the supply. Confirm panels, flooring, openings, electrical fittings, sanitary items and accessories individually.

What determines the quotation?

Provide the project use, country, quantity, layout, materials, service requirements and destination port. Add the proposed site arrangement if multiple units are involved.

Compare another building format.

Review the structure and procurement requirements before choosing your range.

Folding Container Houses factory sample

Folding Container Houses

Building system with folding wall sections. Site offices and project facilities.

Explore this series
Expandable Container Houses factory sample

Expandable Container Houses

Central module with opening side sections. Residential and accommodation supply.

Explore this series

Start with the unit schedule.

A clear functional brief makes the component and assembly discussion more useful.

  • Destination country and intended use
  • Number of units and room requirements
  • Site sketch or preferred unit arrangement
  • Required fixtures, delivery port and installation responsibilities

Ask about this configuration or document ↗